[1] 何军, 于亚伦, 李彤华. 城市建(构)筑物控制拆除的国内外现状[J]. 工程爆破, 1999, 5(3): 78-83.
HE Jun, YU Yalun, LI Tonghua. Current situation of demolishing urban structures with controlled blasting at home and abroad[J]. Engineering Blasting, 1999, 5(3): 78-83(in Chinese)
[2] 徐书雷, 郑学召, 王小林等. 浅述国内外爆破拆除现状[J]. 爆破, 2003, 20(2): 20-23.
XU Shulei, ZHENG Xuezhao, WANG Xiaolin, et al. Brief Description about Current Situation of Demolition Blasting at Home and Abroad[J]. Blasting, 2003, 20(2): 20-23(in Chinese)
[3] 汪旭光, 于亚伦. 21世纪的爆破拆除技术[J]. 工程爆破, 2000, (3): 32-35.
WNAG Xueguang, YU Yalun. Demolition blasting technology faced with the 21 Century [J]. ENGINEERING BLASTING, 2000, (3): 32-35(in Chinese)
[4] 陈宝心, 邓枚. 建(构)筑物机械拆除方法综述[J]. 施工技术, 2004, 33(6): 51- 52.
CHEN Baoxin, DENG Mi. Introduction of mechanical removing-building methods[J]. Construction Technology, 2004, 33(6):51-52(in Chinese)
[5] 林继清. 关于爆破加速度测量的几个问题[J]. 岩土力学, 1984, 5(1): 57-63.
LIN Jiqing. The measuring of explosive acceleration for several problems[J]. Rock and Soil Mechanics, 1984, 5(1): 57-63(in Chinese)
[6] 徐泽沛. 爆破拆除塌落过程及触地振动的分析研究[D]. 长沙理工大学, 2004
[7] 姚琼. 建筑物爆破拆除塌落振动作用下周边结构的安全性分析[D]. 武汉理工大学, 2007
[8] 贺建辉. 爆破地震波作用下建筑物振动数值模拟及安全性评价研究[D]. 长安大学, 2013
[9] 周家汉. 爆破拆除塌落振动速度计算公式的讨论[J]. 工程爆破, 2009, 15(1):1-5.
ZHOU Jiahan. Discussion on calculation formula of collapsing vibration velocity caused by blasting demolition [J]. Engineering Blasting, 2009, 15(1):1-5(in Chinese)
[10] Guo YL, Zuo YJ, Wang DA. Discussion on Collapse Vibration Caused by Demolition Blasting[C] // New Development on Engineering Blasting. Beijing: Metallurgical Industry Press, 2007.
[11] 王小林, 徐书雷, 吴枫. 国内外爆破拆除技术发展现状[ J] . 西安科技学院学报, 2003, 9(3) : 270-273.
WANG Xiaolin, XU Shulei, WU Feng. Current situation and development of demolition blasting at home and abroad[J]. Journal of Xi’an University of Science and Technology, 2003, 9(3):270-273(in Chinese)
[12] 武汉爆破有限公司. 武汉沌阳高架桥爆破拆除方案[R]. 2013.4.12.
[13] 中国工程爆破协会. GB6722-86爆破安全规程[S].
[14] 中国工程爆破协会. GB6722-2003爆破安全规程[S].
[15] 中国工程爆破协会. GB6722-2011爆破安全规程[S].