[1] Yang Y, Yau J, Hsu L. Vibration of simple beams due to trains moving at high speeds[J]. Engineering Structures, 1997,19(11):936-944.
[2] 李慧乐, 夏禾, 郭薇薇. 移动荷载作用下简支梁共振与消振机理研究[J]. 工程力学, 2013,30(7):47-54.
Li H L,Xia H,Guo W W. Study on mechanism of resonance and vibration cancellation for simply-supported beam under moving loads[J]. Engineering Mechanics,2013, 30(7): 47-54.
[3] 王少钦, 夏禾, 郭薇薇, 等. 变速移动荷载作用下简支梁桥的动力响应及共振分析[J]. 振动与冲击, 2010,29(2):26-30.
Wang S Q,Xia H,Guo W W. Dynamic response and resonance analyses for a simply-supported bridge under speed-varying loads[J]. Journal of Vibration and Shock, 2010,29(2):26-30.
[4] Yang Y B, Yau J D. Vertical and pitching resonance of train cars moving over a series of simple beams[J]. Journal of Sound and Vibration, 2015,337:135-149.
[5] 王英杰, 时瑾, 魏庆朝. 单车过桥下弹性车体共振与消振现象分析[J]. 振动与冲击, 2015(2):1-8.
Wang Y J,Shi J,Wei Q C. Resonance and vibration cancellation analysis of a vehicle with flexible car body moving over multi-span bridge[J]. Journal of Vibration and Shock, 2015(2):1-8.
[6] Yang Y B, Lin C W. Vehicle–bridge interaction dynamics and potential applications [J]. Journal of Sound and Vibration, 2005,284(1–2):205-226.
[7] 翟婉明, 王少林. 桥梁结构刚度对高速列车—轨道—桥梁耦合系统动力特性的影响[J]. 中国铁道科学, 2012,33(1):19-26.
Zhai W M, Wang S L. Influence of bridge structural stiffness on dynamic characteristics of high speed train track bridge coupling system[J]. China Railway Science. 2012, 33(1): 19-26.
[8] 欧阳冲, 陈应波, 谢伟平, 等. 基于梁段单元法轨道连续箱梁的车桥耦合动力响应分析[J]. 振动与冲击, 2016,35(17):88-94.
Ouyang C,Cheng Y B,Xie W P. Dynamic responses of a vehicle-bridge coupled railway box girder system based on beam segment model [J]. Journal of Vibration and Shock, 2016,35(17):88-94.
[9] 夏禾, 张楠, 郭薇薇. 车桥耦合振动工程[M]. 北京: 科学出版社, 2014.
Xia H, Zhang N, Guo W W. Vehicle bridge coupled vibration engineering[M]. Beijing: Science Press, 2014.
[10] 夏禾, 郭薇薇, 张楠. 车桥系统共振机理和共振条件分析[J]. 铁道学报, 2006,28(5):52-58.
Xia H, Guo W W, Zhang N, Resonance mechanism and resonance condition analysis of vehicle bridge system[J]. Railway Transaction. 2006, 28(5): 52-58.
[11]蔡超勋, 刘吉元, 肖祥淋, 等. 30t轴重重载货车作用下常用跨度预应力混凝土简支梁动力响应的试验分析[J]. 铁道建筑, 2015(01):1-6.
Cai C Y, Liu J Y, Xiao X L, etc. Experimental analysis of dynamic response of prestressed concrete simple supported beam under 30t axle load heavy haul freight train[J]. Railway Engineering. 2015(01): 1-6.
[12]梅山, 徐升桥, 沈平, 等. 蒙西至华中地区铁路常用跨度简支梁设计方案比选[J]. 铁道勘察, 2014(02):117-121.
Mei S, Xu S Q, S hen P, etc. Monsey to central China common span simple supported beam railway design scheme comparison[J]. Railway Investigation and Surveying. 2014(02): 117-121.
[13] Yang Y B, Yau J D. Resonance of high-speed trains moving over a series of simple or continuous beams with non-ballasted tracks[J]. ENGINEERING STRUCTURES, 2017,143:295-305.