墩底自复位减隔震连续梁桥地震碰撞响应研究

张文学1,2,张红1,2,陈盈1,2,方蓉1,2,赵汗青1,2

振动与冲击 ›› 2020, Vol. 39 ›› Issue (17) : 245-253.

PDF(1981 KB)
PDF(1981 KB)
振动与冲击 ›› 2020, Vol. 39 ›› Issue (17) : 245-253.
论文

墩底自复位减隔震连续梁桥地震碰撞响应研究

  • 张文学1,2,张红1,2,陈盈1,2,方蓉1,2,赵汗青1,2
作者信息 +

Seismic impact response of continuous girder bridge with self-reset seismic reduction and isolation structure at pier bottom

  • ZHANG Wenxue1,2, ZHANG Hong1,2, CHEN Ying1,2, FANG Rong1,2, ZHAO Hanqing1,2
Author information +
文章历史 +

摘要

针对连续梁桥一般只设置一个固定墩,抗震设计难以满足实际需求。提出一种新型墩底自复位减隔震结构,通过振动台试验和有限元模拟研究墩底自复位减隔震结构的减震效果,并以典型铁路三跨连续梁桥为例,探讨墩底自复位减隔震结构对连续梁桥主桥与引桥之间的碰撞影响,分析场地类型、墩高以及地震加速度峰值等对碰撞响应的影响。结果表明:墩底自复位减隔震结构具有良好的减震效果,但有可能增大主桥与引桥之间的碰撞响应;场地类型和墩高对墩底自复位减隔震结构的减震效果影响较大,随着场地由I类场地向IV类场地变化和墩高的增加,墩底自复位减震结构的总体减震效果越明显。

Abstract

Aiming at problems of only one fixed pier usually being set for continuous girder bridges and aseismic design being difficult to meet actual demands, a new self-reset seismic reduction and isolation structure at pier bottom was proposed. The aseismic effect of the proposed structure at pier bottom was studied with shaking table tests and finite element (FE) simulation. Taking a typical 3-span railway continuous girder bridge as an example, effects of the proposed structure at pier bottom on impact between the main bridge and the approach bridge were studied to analyze effects of site type, pier height and peak seismic acceleration on impact response. Results showed that the proposed structure at pier bottom has good aseismic effect, but it may increase impact response between the main bridge and the approach one; site type and pier height greatly affect its aseismic effect, with site type varying from I to IV and increase in pier height, its overall aseismic effect is more obvious.    

关键词

铁路 / 连续梁桥 / 自复位 / 减隔震 / 碰撞

Key words

railway / continuous girder bridge / self-reset / seismic reduction and isolation / impact

引用本文

导出引用
张文学1,2,张红1,2,陈盈1,2,方蓉1,2,赵汗青1,2. 墩底自复位减隔震连续梁桥地震碰撞响应研究[J]. 振动与冲击, 2020, 39(17): 245-253
ZHANG Wenxue1,2, ZHANG Hong1,2, CHEN Ying1,2, FANG Rong1,2, ZHAO Hanqing1,2. Seismic impact response of continuous girder bridge with self-reset seismic reduction and isolation structure at pier bottom[J]. Journal of Vibration and Shock, 2020, 39(17): 245-253

参考文献

[1] 杨毅.桥梁延性抗震设计方法研究[J].北方交通,2017(11):25-26+30.
YANG Yi. Research on Seismic Design Method of Bridge Ductility[J].Northern Traffic, 2017(11):25-26+30.
[2] 王克海.桥梁抗震研究[M].中国铁道出版社,2014.
WANG Kehai. Research on Seismic Resistance of Bridges[M].China Railway Publishing House,2014.
[3] 杨艳,孙金坤,蒋建军等.高阻尼隔震橡胶支座对桥梁抗震性能的影响分析[J].施工技术,2017,46(04):110-114.
YANG Yan, SUN Jinkun, JIANG Jianjun, et al. Influence of High Damping Rubber Bearing on Seismic Performance of the Bridge[J].Construction Technology,2017,46(04):110-114.
[4] 袁万城,李涵,田圣泽等.桥梁拉索减震支座研发及应用[J].结构工程师,2015,31(06):86-90.
YUAN Wancheng, LI Han, TIAN Shengze, et al.Development and Application of the Bridge Cable-sliding Friction Aseismic Bearing [J].Structural Engineer,2015,31(06):86-90.  
[5] 黄星瑞,李双红.摩擦摆支座在桥梁抗震设计中的应用[J].黑龙江交通科技.2017,40(09):136+138.
 HUANG Xingrui, LI Shuanghong. Application of FrictionPendulum in Seismic Design of Bridge[J].Heilongjiang Traffic Technology,2017,40(09):136+138.
[6] 聂健行,赵建锋,李洪一等.拉索防落梁摩擦摆支座减震效果的数值分析[J].青岛理工大学学报,2018,39(01):20-25.
NIE Jianxing, ZHAO Jianfeng, LI Hongyi, et al. Numerical Analysis of Collapse-proof Cable Damping Effect of Friction Pendulum Bearings[J].Journal of Qingdao Technological University,2018,39(01):20-25.
[7] 刘新华,李加武,周琴等.简支梁桥铅芯橡胶支座减震特性研究[J].建筑科学与工程学报,2014,31(03):124-131.
LIU Xinhua, LI Jiawu, ZHOU Qin, et al. Research on Seismic Isolation Characteristics of LRB for Supported Beam Bridge [J].Journal of Architecture and Civil Engineering,2014,31(03):124-131.
[8] 李正英,蒋林均,李正良.曲线连续梁桥不同减隔震方案对比分析[J].振动与冲击,2016,35(10):157-161+173.
 LI Zhengying, JIANG Linjun, LI Zhengliang.Comparative analysis of seismic control schemes for continuous curved girder bridges[J].Journal of Vibration and Shock,2016,35(10):157-161+173.
[9] DEZFULI F H, ALAM M S. Performance-Based Assessment and Design of FRP-Based High Damping Rubber Bearing Incorporated with Shape Memory Alloy Wires[J].Engineering  Structures,2014,61(61):166-183.
[10] LU L Y, HSU C C. Experimental Study of Variable-Frequency Rocking Bearings for Near-Fault Seismic Isolation[J].Engineering Structures,2013,46:116-129.
[11] KATARIA N P, JANGID R S. Seismic Protection of the    Horizontally Curved Bridge with Semi-Active Variable Stiffness Damper and Isolation System[J].Advances in Structural Engineering,2016,19(7).
[12] ROH H S. Seismic Behavior of Structures Using Rocking Columns and Viscous Dampers[J].Dissertations & Theses-Gradworks,2007.
[13] JONSSON, M H, BJARNI B, EINAR H. Earthquake Response of a Base-Isolated Bridge Subjected to Strong Near-Fault Ground Motion[J].Soil Dynamics & Earthquake Engineering, 30.6(2010):447-455.
[14] YAN B, XIA Y, DU X. Numerical Investigation on Seismic Performance of Base-Isolation for Rigid Frame Bridges[J].Journal of Vibro Engineering,2013,15(1):395-405.
[15] 夏修身,陈兴冲.铁路高墩桥梁基底摇摆隔震与墩顶减震对比研究[J].铁道学报.2011,33(09):102-107.
XIA Xiushen, CHEN Xingchong. Controlled Rocking and Pier Top Seismic Isolation of Railway Bridge with Tall Piers[J].Journal of the China Railway Society,2011,33(09):102-107.
[16] 夏修身,陈兴冲.限位装置对桩基础高墩摇摆反应的影响[J].同济大学学报(自然科学版),2013,41(10):1470-1475.
XIA Xiushen, CHEN Xingchong. Restrainer Effect on Rocking Response of Tall Pier with Pile Foundations [J].Journal of Tongji University(Natural Science),2013,41(10):1470-1475.
[17] 夏修身,陈兴冲.桩基础高墩摇摆隔震分析模型研究[J].铁道学报,2013,35(11):86-91.
XIA Xiushen, CHEN Xingchong. Study on Analytical Model for Rocking Isolation of Tall Piers with Pile Foundations[J].Journal of the China Railway Society,2013,35(11):86-91.
[18] 夏修身,李建中.近场地震动对桩基础高墩摇摆反应的影响[J].哈尔滨工业大学学报,2014,46(04):82-86.
XIA Xiushen, LI Jianzhong. Study on Analytical Model for Rocking Isolation of Tall Piers with Pile Foundations [J]Journal of the China Railway Society,2014,46(04):82-86.        
[19] 夏修身,陈兴冲,李建中.高墩自复位隔震机理[J].中南大学学报(自然科学版),2015,46(07):2549-2557.
XIA Xiushen, CHEN Xingchong, LI Jianzhong. Isolation mechanism of self-centering tall pier[J].Journal of Central South University(Science and Technology),2015,46(07):2549-2557.
[20] NAWAWI C, HONG H. Pounding Damage to Buildings and Bridges in the 22 February 2011 Christchurch Earthquake[J].International Journal of Protective Structures,2012,(2):123-139.
[21] CHAU K T, WEI X X, GUO X, et al. Experimental and Theoretical Simulations of Seismic Poundings between Two Djacent Structures[J].Earthquake Engineering & Structural Dynamics,2010,32(4):537−554.
[22] CHAU K T, WEI X X. Pounding of Structures Modelled as Non-Linear Impacts of Two Oscillatos [J].Earthquake Engineering & Structural Dynamics,2010,30(5):633−651.
[23] 张文学,王景景,鲍艳.斜拉桥与引桥地震碰撞影响因素研究[J].振动与冲击,2012,31(23):115-117+127.
ZHANG Wenxue, WANG Jingjing, BAO Yan. Earthquake impact influence factors for a cable-stayed bridge and its approach bridge[J].Journal of Vibration and Shock,2013,31(23):115-117+127.
[24] 闫聚考,李建中,彭天波,等.大跨度悬索桥主引桥碰撞效应振动台试验及数值研究[J].振动与冲击,2017,36(07):234-240+261.
YAN Jukao, LI Jianzhong, PENG Tianbo, et al. Shaking table tests and numerical analysis for pounding effect between main span and approach span of long-span suspension bridges[J].Journal of Vibration and Shock,2017,36(07):234-240+261.
[25] 张文学,赵汗青,赵旭,等.连续梁桥墩底自复位减隔震机理及参数优化分析[J].铁道学报,2018,40(09):145-153.
Zhang Wenxue,Zhao hanqing,Zhao Xu, et al.Study on self-Centering Shock Isolation Mechanism and Parameters Optimization at Fixed Pier Bottom for Continuous Bridge[J].Railway Journal,2018,40(09):145-153.
[26] 李建中,范立础.非规则梁桥纵向地震反应及碰撞效应[J].土木工程学报,2005(01):84-90.
LI Jianzhong, FAN Lichu. Longitudinal Seismic Response and Pounding Effects of Girder Bridges with Unconventional Configurations[J].Journal of Civil Engineering,2005(01):84-
90.


PDF(1981 KB)

Accesses

Citation

Detail

段落导航
相关文章

/