模型试验及数值模拟下尾矿库溃坝尾砂流演变预测

罗昌泰1,2,李栋伟1,余国平3,张潮潮1,徐斌2

振动与冲击 ›› 2022, Vol. 41 ›› Issue (3) : 307-315.

PDF(2690 KB)
PDF(2690 KB)
振动与冲击 ›› 2022, Vol. 41 ›› Issue (3) : 307-315.
论文

模型试验及数值模拟下尾矿库溃坝尾砂流演变预测

  • 罗昌泰1,2,李栋伟1,余国平3,张潮潮1,徐斌2
作者信息 +

Evolution prediction of tailings flow in dam break of tailings pond under model test and numerical simulation

  • LUO Changtai1,2, LI Dongwei1, YU Guoping3, ZHANG Chaochao1, XU Bin2
Author information +
文章历史 +

摘要

尾矿库溃坝所产生的尾砂流类似于地质灾害中的泥石流,具有发展迅速、破坏性强、影响范围广和预警时间不足等特点,研究溃坝尾砂流的演变规律及其影响范围对防灾减灾具有重要的意义。本研究利用RAMMS碎屑流软件建立了数值三维模型进行数值仿真溃坝模拟,通过物理模型(1:150)试验研究了溃坝的尾砂流对下游的演变进程和影响范围,并将其试验数据与数值计算结果对比分析,验证了数值模拟在溃坝仿真上的可靠性和有效性。结果表明,以漫顶水流到达拦砂坝底开始计时,尾矿坝溃坝9 min尾砂流开始冲击距尾矿坝0.7 km处的下游村庄;随着溃坝的持续,溃坝泥砂淤积逐步加深,水位继续升高,并在18 min对下游造成全面淹没,影响范围达0.558 km2,库内尾砂的溃泄总量可达1.3×107m³。建议在尾矿库的设计、管理和风险评估过程中,结合潜在的危险范围,合理的增加防灾减灾的措施。

Abstract

The tailing flow generated after dam failure will evolve into Geo-hazards like debris flows. Tailings flow is characterized by rapid development, strong destructiveness, wide range of influence and insufficient warning time. It is of great significance for disaster prevention and mitigation to study the evolution law of dam-break tailings flow and its influence range. In the study, we used RAMMS debris flow software to establish a numerical three-dimensional model for the numerical simulation of dam-break. We tested the evolution process and influence range of the dam-break tailings flow on the downstream by building a physical model (1:150), and compared the experimental data with the numerical calculation results to verify the reliability and effectiveness of the numerical simulation. The results showed that in the process of the tailings dam-break, the tailings flow began to impact downstream villages (0.7 km away from the tailings dam) within 9 minutes when we started timing from the over-topping water reaches the bottom of the dam. As the dam break continued, the dam-break silt deposits gradually deepened, and the water level continued to rise. Finally, it caused a full-scale flooding of the downstream within 18 minutes, with an impact area of 0.558 km2, and the total amount of tailings in the reservoir could reach 1.3×107m³. It is strongly recommended that the design, management and risk assessment of tailings dams should be combined with potential hazards to increase disaster prevention and mitigation measures.

关键词

尾矿库 / 溃坝 / 模型试验 / RAMMS / 防灾减灾

Key words

tailing / dam failure / physical model / RAMMS / disaster prevention and mitigation

引用本文

导出引用
罗昌泰1,2,李栋伟1,余国平3,张潮潮1,徐斌2. 模型试验及数值模拟下尾矿库溃坝尾砂流演变预测[J]. 振动与冲击, 2022, 41(3): 307-315
LUO Changtai1,2, LI Dongwei1, YU Guoping3, ZHANG Chaochao1, XU Bin2. Evolution prediction of tailings flow in dam break of tailings pond under model test and numerical simulation[J]. Journal of Vibration and Shock, 2022, 41(3): 307-315

参考文献

[1] 魏勇,许开立,郑欣,等.尾矿坝溃坝事故致因分析[J]. 中国矿业, 2009, 18(6):98-99.
WEI Yong, XU Kaili, ZHENG Xin, et al. Analysis of cause of tailings dams failure accidents[J]. China Mining Gazine, 2009, 18(6):98-99.
[2] LEMPHERSN. Could the Hungarian tailings dam tragedy happen in Alberta[Z].2010.
[3] DAVIES M P. Tailings impoundment failures: are geotechnical engineers listening? Geotechnical News. September, 2002, 31-36.
[4] 石国领.襄汾"9•8"溃坝事故严格救援中的信息报告[R].北京:《劳动保护》杂志社,2018.
[5] 周振民,李香园. 我国尾矿坝溃坝事故成因及生态环境影响评价[J].金属矿山,2012,41(11):121-124.
ZHOU Zhenmin,  LI Xiangyuan. The cause of tailings dam accident and ecological environmental impact assessment in China[J]. Metal Mine, 2012, 41(11): 121-124.
[6] RICO M, BENITO G, SALUGUEIRO R, et al. Reported tailings dam failures. A review of the European incidents in the worldwide context[J]. Journal of Hazardous Materials, 2008, 152(2), 846-852.
[7] YIN, GZ,LI G Z, WEI ZA, et al. Stability analysis of a copper tailings dam via laboratory model tests: A Chinese case study [J].2011,24(2):122-130.
[8] LYU ZJ, CHAI JR, XU ZG, et al. A comprehensive review on reasons for tailings dam failures based on case history. Advances in Civil Engineering, 2019, 1-18.
[9] POULAD, DANESHVAR, ATTILA. Simulation of tailings flow resulting from a dam breach using smoothed particle hydrodynamics[J]. Environmental & Engineering Geoscience, 2018,24(3), 263-279.
[10] 李云, 李君.溃坝模型试验研究综述[J].水科学进展, 2009, 20 (2) :304-310.
LI Yun, LI Jun. Review of experimental study on dam break[J]. Advances in water science, 2009,20(2):304-310.
[11] 刘慧玲, 李海桥. 基于光滑粒子流体动力学方法的溃坝水流模拟[J].人民长江, 2019, 50(7):150-154,159. LIU Huiling, LI Haiqiao. T-stress’s impact on crack initial fracturing angles of brittle materials[J]. Yangtze River, 2019, 50(7): 150-154,159.
[12] CHEN HX, LI J, FENG SJ, et al. Simulation of interactions between debris flow and check dams on three-dimensional terrain[J]. Engineering Geology. 2019, 251, 48-62.
[13] KEAN JW, MCCOY, SW, TUCKER GE, et al. Runoff-generated debris flows: observations and modeling of surge initiation, magnitude, and frequency[J]. Journal of Geophysical Research Earth Surface. 2013, 118(4), 2190-2207.
[14] 何晓英,唐红梅,朱绣竹,陈洪凯.泥石流浆体冲击特性实验研究[J].振动与冲击,2013,32(24):127-134.
HE Xiaoying,TANG Hongmei,ZHU Xiuzhu, et al.Tests for impacting characteristics of debris flow slurry[J].Journal of vibration and shock,2013,32(24):127-134.
[15] MARTIN TE, DAVIES MP, RICE. S. Stewardship of tailings facilities[J]. Mining, Minerals and Sustainable Development. 2002, 20, 1-37.
[16] DONG LJ, SHU, WW, SUN DY, et al. Pre-alarm system based on real-time monitoring and numerical simulation using internet of things and cloud computing for tailings dam in mines[J]. Ieee Access. 2017, 5, 21080-21089.
[17] WANG K, YANG P, HUDSON-EDWARDS KA, et al. Integration of DSM and SPH to model tailings dam failure run-out slurry routing across 3D real terrain[J]. Water,2018, 10(8), 1-15.
[18] KONZUK J S, KUEPER B H. Evaluation of cubic law based models describing single-phase flow through a rough-walled fracture[J]. Water Research, 2004, 40, 1-17.
[19] CHRISTEN M, KOWALSKI J, BARTELT P. RAMMS: numerical simulation of dense snow avalanches in three-dimensional terrain[J]. Cold Regions Science and Technology. 2010, 63, 1-14.
[20] 甘建军,罗昌泰.中低山冲沟型泥石流运动参数及过程模拟[J].自然灾害学报,2020,29(02):97-110.
GAN Jianjun, LUO changtai. Runout and process simulation of gully debris flow in middle and low mountains [J].Journal of natural disasters,2020,29(02):97-110.
[21] 乔成,欧国强,潘华利,王钧,宇岩.泥石流数值模拟方法研究进展[J].地球科学与环境学报,2016,38(01):134-142.
QIAO Cheng, OU Guoqiang, PAN Huali et al. Review on numerical modeling methods of debris flow[J].Journal of earth sciences and environment, 2016,38(01):134-142.
[22] 宋兵,沈军辉,李金洋,黄涛.RAMMS在泥石流运动模拟中的应用—以白沙沟泥石流为例[J].泥沙研究,2018,43(01):32-37.
SONG Bing, LI Jinyang, SHEN Junhui, et al. Application of RAMMS model on simulation of debris flow in the Basha Gully[J].Journal of Sediment Research,2018,43(01):32-37.
[23] BARTELT P, SALM B, GRUBER U. Calculating dense-snow avalanche runout using a Voellmy-fluid model with active/passive longitudinal straining[J]. Journal of Glaciology, 1999, 45: 242-254.
[24] SAVAGE S B, HUTTER K. The motion of a finite mass of granular material down a rough incline[J]. Journal of Fluid Mechanics,1989, 199: 177-215.
[25] 敬小非,尹光志,魏作安,等. 尾矿坝垮塌机制与溃决模式试验研究[J]. 岩土力学, 2011(05):101-108+128.
JIANG Xiaofei, YIN Guangzhi, WEI Zuoan, et al. Model experiment study of collapse mechanism and broken mode of tailings dam[J]. Rock and Soil Mechanics, 2011,5, 101-108,128.
[26] 张红武,刘磊,卜海磊,钟德钰.尾矿库溃坝模型设计及试验方法[J].人民黄河,2011,33(12):1-5.
ZHANG Hong-wu, LIU Lei, BU Hailei  et al. Test and Design of Tailings Dam Model[J]. Yellow River,2011, 33(12): 1-5.
[27] FATHANI T F, LENGONO D, ALFATH M A. Sensitivity analysis of depth-integrated numerical models for estimating landslide movement[J]. Journal of Disaster Research, 2017,12(3):607-616.
[28] HANCOCK GR, WILLGOOSE GR. The interaction between hydrology and geomorphology in a landscape simulator experiment. Hydro-logical Processes. 2001, 15: 115–133.
[29] HANCOCK GR, WILLGOOSE GR. A qualitative and quantitative evaluation of experimental model catchment evolution. Hydrological Processes. 2003, 17: 2347–2363.

PDF(2690 KB)

Accesses

Citation

Detail

段落导航
相关文章

/