Coalmine Roadway Excavation Blasting Seismic Wave Signal Analysis Based on HHT Method

ZONG Qi.;WANG Haibo.;XU Ying.;FU Jugen.

Journal of Vibration and Shock ›› 2013, Vol. 32 ›› Issue (15) : 116-120.

PDF(1826 KB)
PDF(1826 KB)
Journal of Vibration and Shock ›› 2013, Vol. 32 ›› Issue (15) : 116-120.
论文

Coalmine Roadway Excavation Blasting Seismic Wave Signal Analysis Based on HHT Method

  • ZONG Qi1.2,WANG Haibo1.2,XU Ying1.2,FU Jugen1.2
Author information +
History +

Abstract

Blasting seismic wave signal frequency spectrum characteristics and energy distribution of coalmine roadway excavation was studied by the HHT method and EMD decomposition. The results show that: the master frequency of roadway excavation blasting in range of 100 Hz to 250 Hz, and the main energy concentrated in range of 160 to 260 Hz; energy distribution in range of 0 to 160 Hz weak, and distributed uniform. Due to millisecond blasting, correspond with particle vibration amplitude, vibration energy mainly concentrated in two time periods: 0.25 s to 0.31 s, 0.35 s to 0.4 s, and there are four instantaneous peaks, the largest instantaneous energy was caused by charge of caving holes. According to the research results, countermeasures for blasting seismic effect reduction were given from view of blasting energy control.

Key words

Roadway excavation / blasting / seismic wave / HHT method / time and frequency / energy

Cite this article

Download Citations
ZONG Qi.;WANG Haibo.;XU Ying.;FU Jugen.. Coalmine Roadway Excavation Blasting Seismic Wave Signal Analysis Based on HHT Method[J]. Journal of Vibration and Shock, 2013, 32(15): 116-120
PDF(1826 KB)

Accesses

Citation

Detail

Sections
Recommended

/