Cumulative damage feature analysis for shared rock in a neighborhood tunnel under cyclic explosion loading

CAO Feng1,2,3, LING Tonghua1, LI Jie4,HUANG Fu1

Journal of Vibration and Shock ›› 2018, Vol. 37 ›› Issue (23) : 141-148.

PDF(1862 KB)
PDF(1862 KB)
Journal of Vibration and Shock ›› 2018, Vol. 37 ›› Issue (23) : 141-148.

Cumulative damage feature analysis for shared rock in a neighborhood tunnel under cyclic explosion loading

  • CAO Feng1,2,3, LING Tonghua1, LI Jie4,HUANG Fu1
Author information +
History +

Abstract

To study the effects of cyclic blast loading on shared rock in a neighborhood tunnel,taking Liuyuetian bifurcation tunnel as the engineering background,a 3D model of the bifurcation tunnel was constructed using the finite element software LS-DYNA.Based on the HJC constitutive model,the damage variable was introduced to simulate the cumulative damage evolution process of the remained rock in the neighborhood tunnel under cyclic blast loading,and explore the relation among shared rock’s damage degree,damage range and explosion number.According to the decay law of mass point vibration velocity in the damage zone,the relation among single blasting charge,the maximum damage range and the critical damage mass point peak vibration velocity was established through data fitting.Finally,the simulation results were compared with those of acoustic wave tests on site to verify the rationality and correctness of the numerical simulation results.The results showed that the numerical simulation results agree well with those of tests on site,and the maximum damage zone appears on arch shoulder of shared rock; compared with a single blasting,the cumulative damage range caused by cyclic blasting excavations increases obviously,while the critical damage mass point peak vibration velocity drops significantly.

Key words

tunnel engineering / neighborhood tunnel / interlaid rock wall / cumulative damage / numerical simulation

Cite this article

Download Citations
CAO Feng1,2,3, LING Tonghua1, LI Jie4,HUANG Fu1. Cumulative damage feature analysis for shared rock in a neighborhood tunnel under cyclic explosion loading[J]. Journal of Vibration and Shock, 2018, 37(23): 141-148

References

[1] 张庆松,李利平,李术才,等.小间距隧道爆破动力特性试验研究[J].岩土力学,2008, 29(10): 2655-2660.
ZHANG Qing-song, LI Li-ping, LI Shu-cai, et al. Experimental study of blasting dynamic vibration of closely adjacent tunnels[J].Rock and Soil Mechanics, 2008, 29(10): 2655-2660.
[2] 凌同华,廖艳程,张胜.岩体爆破震动损伤评估的多元判别分析模型[J].中南大学学报(自然科学版),2010,41(1):322-327.
LING Tong-hua,LIAO Yan-cheng,ZHANG Sheng.Safety criterion method of rock blasting vibration damnification based on multivariant discriminant analysis model[J].Journal of Central South University: Science and Technology,2010,41(1):322-327.
[3] 刘永胜,彭立,王梦恕,等.爆破作用下隧道裂隙围岩破裂范围[J].中国公路学报,2015,28(10):83-89.
LIU Yong-sheng,PENG Li,WANG Meng-shu,et al.Blast induced Fractured Zone of Fractured Rock-mass Tunnel [J]. China Journal of Highway and Transport,2015,28(10):83-89.
[4] 左双英,肖明,续建科,等.隧道爆破开挖围岩动力损伤效应数值模拟[J].岩土力学,2011,32(10):3171-3184.
ZUO Shuang-ying,XIAO Ming,XU Jian-ke,et al. Numerical simulation of dynamic damage effect of surrounding rocks for tunnels by blasting excavation[J].Rock and Soil Mechanics,2011,32(10):3171-3184.
[5] 陈俊桦,张家生,李新平.大型地下厂房开挖爆破损伤影响范围及评价研究[J].振动与冲击,2015,34(23):54-61,67.
CHEN Jun-hua,ZHANG Jia-sheng,LI Xin-ping.Rock blasting-induced damage zone and its evaluation during excavation of a large-scale underground powerhouse[J].Journal of vibration and shock,2015,34(23):54-61,67.
[6] MALMGREN L,SAIANG D,TOYRA J,et al.The Excavation Disturbed Zone(EDZ) at Kiirunavaara Mine,Sweden-By seismic measurements[J].Journal of Applied Geophysics,2007,61(1):1-15.
[7] HAMDI E,ROMDHANE N B,LECLEAC'H J M. A tensile damage  model for rocks:Application to blast induced damage assessment[J].Computers and Geotechnics,2011,38(2):133-141.
[8] 杨建华,卢文波,胡英国,等.隧洞开挖重复爆炸荷载作用下围岩累积损伤特性[J].岩土力学,2014,35(2):511-518.
YANG Jian-hua,LU Wen-bo,HU Ying-gao,et al.Accumulated damage in surrounding rocks due to repeated blasting loads during blasting excavation of tunnels[J]. Rock and Soil Mechanics,2014,35(2):511-518.
[9] 张国华,陈礼彪,夏祥,等.大断面隧道爆破开挖围岩损伤范围试验研究及数值计算[J].岩石力学与工程学报,2009,28(8):1610-1619.
ZHANG Guo-hua,CHEN Li-biao,XIA Xiang,et al.Numerical simulation and experimental study of damage range of surrounding rock in large tunnel under blasting excavation[J]. Journal of Rock Mechanics and Engineering,2009,28(8):1610-1619.
[10] 林从谋,蔡丽光,蒋丽丽.小净距隧道爆破中夹岩累积损伤测试研究[J].兵工学报,2009,30(S2):228-232.
LING Cong-mou,CAI Li-guang,JIANG Li-li.Study on cumulative damage of shared rock in small interval tunnel blast[J].Acta Armamentarii,2009,30(S2):228-232.
[11] 褚怀保,叶红宇,杨小林,等. 基于损伤累积的爆破振动传播规律试验研究[J].振动与冲击,2016,35(2):173-177.
CHU Huai-bao,YE Hong-yu,YANG Xiao-lin,et al.Experiments on propagation of blasting vibration based on damage accumulation[J].Journal of vibration and shock,2016,35(2):173-177.
[12] 湖南省交通规划勘察设计院.湖南省永顺至吉首高速公路第2合同段六月田隧道详细工程地质勘察报告[R].长沙,湖南省交通规划勘察设计院,2012.
Hunan provincial communications planning,survey & design institute. Yongshun to jishou in hunan province highway tunnel contract period of liuyuetian 2 detailed engineering geological investigation report. [R].changsha: Hunan provincial communications planning,survey & design institute.2012.
[13] 潘昌实.隧道力学数值方法[M].北京: 中国铁道出版社,1995.
[14] Holomquist T J,Johnson G R,Cook W H.A computational constitutive model for concrete subjective to large strains,high strain rates,and high pressures[C]//Jackson N,Dickert S.The 14th International Symposium on Ballistics,USA:American Defense Prepareness Association,1993:591-600.
[15] 方秦,孔祥振,吴昊,等. 岩石 Holmquist-Johnson-Cook 模型参数的确定方法[J].工程力学,2014,31(3):197-204.
FANG Qin,KONG Xiang-zhen,WU Hao,et al.Determination ofHolmquist-Johnson-Cook Consitiutive Model Parameters of Rock[J].Engineering Mechanics,2014,31(3):197-204.
[16] 白金泽.LS-DYNA3D理论基础与实例分析[M].北京:科学出版社,2005.
BAI Jin-ze.LS-DYNA3D The theoretical basis and case analys.[M].BeiJing:China Science Press,2005.
[17] LSTC.LS-DYNA Keyoword user’s manual[M].Livermore:Li -vermore Software Technology Corporation,2007.
[18] 林从谋,陈礼彪,蒋丽丽,等.高速公路扩建大断面特小净距隧道爆破稳定控制技术研究[J].岩石力学与工程学报,2010, 29(7): 1371-1378.
LIN Cong-mou,CHEN Li-biao,JIANG Li-li,et al.Research on blasting stability control technology of large-span  highway with super-small clear spacing highway expansion project[J]. Journal of Rock Mechanics and Engineering, 2010, 29(7):1371-1378.
[19] 戴俊.岩石动力学特性与爆破理论[M].北京:冶金工业出版社,2013.
DAI Jun.Dynamic behaviors and blasting theory of rock[M].Beijing:China Metallurgical Industry Press,2013.
[20] 陈宝心,杨勤荣.爆破动力学基础[M].武汉:湖北科技出版社,2005.
CHEN Baoxin,YANG Qinrong.Foundation of demolition dynamics[M].Wuhan:Hubei Science and Technology Press,2005.
[21] 李新平,陈俊桦,李友华,等. 溪洛渡电站地下厂房爆破损伤范围及判据研究[J].岩石力学与工程学报,2010,29(10):2042-2049.
LI Xinping,CHEN Junhua,LI Youhua,et,al. Study of criterion and damage zone induced by excavation blasting of underground power-house of xiluodu hydropower station[J]. Journal of Rock Mechanics and Engineering,2010,29(10):2042-2049
[22] 中华人民共和国行业标准编写组.DL/T5389-2007.水工建筑物岩石基础开挖工程施工技术规范[S].北京:中国水利水电出版社,2007.
Construction technical specifications on rock-foundation excavating engineering of hydraulic structures[S].Bei jing:StandardsPress of China.2007.